The project in figures
- Jet grouting DSM: 27 455 m
- Sefi dam: 28 206 m²
- Larsen sheet piling: 438 running meters
- Berm forming: 102 327 m³
- Renovation and heightening of the existing embankment walls: 2 758 running meters
- New embankment walls: 5 663 running meters
- Dismountable flood protection DPS 2000: 868 running meters